Quick Find
Energy Experts
- All users
- Laurence Jones
- Adrian Wright
- Linn Rafferty
- Simon Forsyth
- Tim Pullen
- Howard Johns
- Hugo House
- John Martin
- Matthew Rhodes
- John Barker-Brown
- John Lightfoot
- Barry Nutley
- Chris Rudge
- Gabriel Wondrausch
- Paul Hutchens
- David Hunt
- Graham Eastwick
Other Contributors
Cathy Debenham Gilly JonesGuest Bloggers
Aldous EverardChris RowlandDavid FieldsDuncan McIntoshGordon TraillJames PageJon EdgeLisa HallMatt CodyMax SillarsMike MackmurdieNick RoachRob PalgraveRoger CroftSimon FixterStewart BoyleArchive
Posting rulesRecent Comments
- As installers we were all warned investigations and prosecutions of both in…
comment by rudge-renewables-ex12-4aa
- Hi Paul Sorry for the delay responding. You don't have to use the energy…
comment by Cathy Debenham
- Hello Chris, I have a question about heating water by solar power to r…
comment by Dave Thickett
Tag Cloud
YouGen Blog
Heat pumps: 10 things a good installer should ask
Posted by John Barker-Brown on 24 May 2010 at 12:20 pm
Finding an installer for a renewable energy technology should be a straight forward exercise. With all the certification an installer has to meet, such as the Microgeneration Certification Scheme (MCS), to enable a client to access grants, the installer has to know what they are talking about and be competent. Don’t they?
Unfortunately, with the installation of heat pumps about to explode due to the Renewable Heat Incentive (RHI) and other incentives being offered, the installer market will see a number of unscrupulous companies trying to cash in, even if they have the ‘correct’ approvals.
As an aside, there are a number of companies who aren’t approved who are more than competent, do an excellent job and have been involved in installing renewable technologies for years and are not MCS approved simply as it can be a difficult and onerous process particularly for one man bands, but that’s a different subject. [NB: if you want to benefit from the RHI, you will need to use a MCS accredited installer - ed]
It therefore pays for the client to still do their homework on any potential installer/supplier.
The normal guidelines for entering any contract will apply, such as: references - preferably actually talking to previous clients - ideally ones who have lived with the technology for at least a year; talking to a number of companies to obtain comparable quotes; trade associations, etc.
However you would also expect the installer/supplier to ask you questions, and these questions, or lack of them, should give you an indication of whether the company actually knows what it is talking about.
1. Is the building being insulated to current building standards? This should be one of the first questions the installer/supplier should ask as it will determine whether heat pump technology is right for the building. See my blog on whether heat pumps are suitable for your home).
2. Will a SAP calculation be available? A Standard Assessment Procedure (SAP) can be used to calculate the size of a heat pump suitable for the property as it takes into account the form, construction and insulation levels of the property. It can also be used to check the insulation levels of the property.
3. What is the overall area of the building to be heated? In the absence of a SAP, the overall area of the building can give an installer/supplier an initial indication of the size of the heat pump required.
4. How is the property being heated? UFH (under floor heating) or radiators? This will determine the efficiency of the heat pump and will impact on your fuel costs and hence payback.
5. How is the domestic hot water (DHW) being heated? Is solar thermal being installed? The heat pump can provide domestic hot water if required, however the installer/supplier needs to be aware of this as it does have an impact on the amount of ground arrays and the equipment supplied. DHW is an additional load on the ground and is all year round so the ground arrays need to be increased, also any hot water cylinders need to have oversized coils due to the lower temperature generated by heat pumps.
6. What is the floor construction of the building? Joisted, beam and block or other? Floor construction can again have an impact on efficiency for example for a joisted underfloor first floor system the flow temperature has to be higher than the magical 35oC always quoted for underfloor, as the heat has to be driven through the floorboards.
7. Is a single or three phase electrical connection available on site? Some manufacturer’s single phase heat pumps are limited in size (Kensa can offer a 24kW, which is one of the largest in the market place). Three phase is better as the heat pumps are more efficient and it is a more stable electricity supply but expensive to put in.
8. Is an area roughly twice the area of the property available for the ground arrays? For ground source heat pumps horizontal arrays, i.e. slinkies or straight pipe roughly twice the area to be heated is required for these. If this isn’t available then the alternative is boreholes. While equally effective they can be expensive.
9. Has planning permission been obtained? Ground source are a permitted development, but air source currently still require planning permission.
10. Finally be aware of any significant differences for claimed COPs. This should be quoted at standard conditions as laid out by EN14511-2 and should provide a means of comparing like for like. Any other standard will give different figures. In fact COPs from one brand to another should be roughly the same as many will contain similar if not the same key components
Photo by motumboe
About the author: John Barker-Brown is special projects manager at British heat pump manufacturer Kensa Engineering.
If you have a question about anything in the above blog, please ask it in the comments section below.
Comments
0 comments - read them below or add one
No Comments.
Leave a comment
You must log in to make a comment. If you haven't already registered, please sign up as a company or an individual, then come back and have your say.
Follow us on Twitter
A big day for the renewables industry tomorrow. Still hopeful that the proposals will be good. 10 hours ago
@websitesahoy It is there, I saw it. 10 hours ago
This map shows all the great community energy projects that have just got LEAF funding http://t.co/zXOD0FVN 12 hours ago